Franske CNT-2612 Labs and Homework

From ITCwiki
Jump to navigation Jump to search
  • Lab 1-1 AND Lab 1-2 (One lab report for both) - Clearing Switches
  • Lab 2-1: VLANs
    • Lab Errata: In this lab you are asked to shut down vlan 120 on one of the ALS systems. You will not be able to do this following the instructions in the lab because ALS is setup in VTP Client mode. Instead you can issue shutdown vlan 120 in the global config mode on the ALS switch which has the effect they are looking for (only locally disabling the vlan) or run the commands as indicated in the lab but on the DLS VTP Server. The goal here is to see the difference between shutting down a vlan (local to the switch) and suspending a vlan (global across VTP domain).
  • Lab 2-2: Etherchannel
  • Lab 3-1: Default STP
  • Lab 3-2: Modifying STP
  • Lab 3-3: PVST STP
  • Lab 3-4: MST STP
  • Lab 4-1: Inter-VLAN Routing
  • Lab 4-2: Inter-VLAN CEF Routing
  • Lab 4-3: VLAN Case Study
  • Lab 5-1: HSRP
  • Lab 5-2: IP SLA
  • Lab 6-1: Securing Layer 2
  • Lab 6-2: Securing STP
  • Lab 6-3: Securing VLANs
    • Lab Note: In this lab you will be configuring private VLANs, these are not supported on the Catalyst 3550 switching platform. You will need to use two 3560 switches for your DLS layer!
  • Lab 7-1: IP Telephony Support
    • Lab Note: AutoQOS is not supported on PortChannel interfaces on 3550 switches.
  • Enterprise Wireless Lab
  • Design-A-Lab I: VRRP & GLBP
    • Lab Note: The Catalyst 3550 and 3560 switches do not support VRRP or GLBP, you will have to use 2811 routers instead of multilayer switches.
  • Design-A-Lab II: QoS
  • IPv6 Lab