Franske CNT-2612 Labs and Homework

From ITCwiki
Revision as of 20:14, 19 March 2012 by BenFranske (talk | contribs)
Jump to navigation Jump to search
  • Lab 1-1 AND Lab 1-2 (One lab report for both) - Clearing Switches
  • Lab 2-1: VLANs
    • Lab Errata: In this lab you are asked to shut down vlan 120 on one of the ALS systems. You will not be able to do this following the instructions in the lab because ALS is setup in VTP Client mode. Instead you can issue shutdown vlan 120 in the global config mode on the ALS switch which has the effect they are looking for (only locally disabling the vlan) or run the commands as indicated in the lab but on the DLS VTP Server. The goal here is to see the difference between shutting down a vlan (local to the switch) and suspending a vlan (global across VTP domain).
  • Lab 2-2: Etherchannel
  • Lab 3-1: Default STP
  • Lab 3-2: Modifying STP
  • Lab 3-3: PVST STP
  • Lab 3-4: MST STP
  • Lab 4-1: Inter-VLAN Routing
  • Lab 4-2: Inter-VLAN CEF Routing
  • Lab 4-3: VLAN Case Study
  • Lab 5-1: HSRP
  • Lab 5-2: IP SLA
  • Lab 6-1: Securing Layer 2
  • Lab 6-2: Securing STP
  • Lab 6-3: Securing VLANs
  • Lab 7-1: IP Telephony Support
  • Lab 7-2: Wireless Support
  • Lab 7-3: Voice Security Case Study
  • Design-A-Lab I: VRRP & GLBP
  • Design-A-Lab II: QoS
  • IPv6 Lab