Tasks for student lab assistants
Revision as of 16:27, 27 October 2010 by BenFranske (talk | contribs) (Created page with 'This page contains a list of tasks for student lab assistants to complete. Tasks may be designated as things to be done on an ongoing basis or things that only need to be done on…')
This page contains a list of tasks for student lab assistants to complete. Tasks may be designated as things to be done on an ongoing basis or things that only need to be done once and are separated into those categories. Once a one-time task is done please edit the wiki page, do not remove the task from the list, but do mark it as done. If you are performing lab maintenance for credit you need to keep a log of each day you worked on things, how long you worked and what you did. If an instructor or open lab manager is available to sign your log entry please have them sign it.
Ongoing Tasks
- Erase configurations (startup configs and vlan.dat files) from routers and switches
- Remove any cabling not currently in use
- Pick up any cables on the floor and re-hang them in the correct locations
- Make sure that their is an equitable distribution of each type of cable needed in each of the CNT labs
Weekly Tasks
October 25-29, 2010
- Count the number and type of multi-layer switches (3550, 3560, etc.) in each CNT lab (including B120) and report on the number of them to Ben
- Perform recovery on the switches marked with tape in B143 and get them back into operational status with the current IOS image
October 1-5, 2010
- Work on cleaning-up and re-wiring the power to all of the CCNA equipment in B143 so all equipment has power and power cabling is more neat
- Update IOS images on routers in B109